1450 3 Way Gold Stamp Mill

A 20stamp mill was in operation by december of 1885 and was later replaced by an 80stamp milletween 1885 and 1888 the operation produced 2million dollarsthe richest sulphide ore came from the 200 to 300ft level and was said to carry 100 ounces of silver and 3 gold per ton reported 100,000 in ore was taken from the mine.

Copyright© 2018 TENIC machinery.All rights reserved.Sitemap